Muros Pré-Fabricados 910 541 877

Where we work · Lisbon Metropolitan Area

Concrete walls in Setúbal

Yes, we deliver and install in Setúbal. Our warehouse is in the Greater Lisbon area, a 59.7 km from the municipality seat — about 44 minutes of road. The most common plot here is hard rock on the slope, sand on the plain, which makes the installation varies greatly. It is the plot, more than the length of the wall, that governs the lead time.

59.7 kmFrom our warehouse
44 minTravel time
Hard rock on the slope, sand on the plainMost common ground
Varies greatlyInstallation difficulty
South bankDelivery logistics
Slightly undulatingGround relief
20–30 m/dayInstallation pace

Leave your name and telephone number to receive a quote

Delivery from our warehouse

We have our own warehouse in Greater Lisbon. From the warehouse door to Setúbal town hall it is 59.7 km, about 44 minutes of road. The four stock textures leave without waiting for production; what is made to order goes into manufacturing first.

The delivery crosses the Tejo over the Vasco da Gama bridge, which adds a toll and sensitivity to peak-hour traffic — which is why unloading on the south bank is scheduled outside the busiest times.

Distance and time measured by actual road routing to the municipality's main town, not as the crow flies. Within the municipality the figure varies with the parish.

Salty air

This municipality has an exposed waterfront. It is where the difference between concrete and metal stops being aesthetic: concrete does not corrode or react to salt air, unlike any galvanised metal fence. The panel's water absorption is ≤ 6 %.

This applies to the wall, not to the accessories: gates, hinges and locks are still metal and still need maintenance near the sea.

What ground you will find in Setúbal

In a precast concrete wall, almost all of the site time goes into drilling the post holes. That is why it is the plot, and not the length, that governs the lead time.

Varies greatly Hard rock on the slope, sand on the plain. Two different things in the same municipality: hard rock on the hillside, sand on the flat part.

What that means in practice

Hard rock, and sometimes at shallow depth. Drilling is unavoidable on the slope. On the flat areas to the north the same parish can have sand — the two situations coexist within the same municipality.

Slow going in the hills, fast in the sandy part. It is the municipality where it is most worth seeing the line before giving a lead time.

In this particular municipality

A city between the Sado estuary and the Serra da Arrábida: limestone and dolomite on the hillside, alluvium and sand by the water, salty air along the whole riverfront.

Geological term, for anyone who wants to check: limestones and dolomites of the Arrábida. Arrábida anticline and Serra de São Luís: Lower and Middle Jurassic dolomites and Middle Jurassic limestones.

This is the municipality standard, not a guarantee for your plot. Two plots on the same street can have different layers, and old backfill turns up where nobody expects it. The lead time is only firm once we have seen the line of the wall — until then, what is here is meant to give you an idea, not to plan the works.
Each post is concreted into a hole of 300 × 300 × 800 mm, with 800 mm buried — the minimum is 700 mm. It is that embedment that ensures the wind resistance of the segment, and it is what the local geology makes easy or difficult.
  • Geological setting of the Lisbon region, the Volcanic Complex and the Miocene series pt.wikipedia.orglxrisk.cm-lisboa.pt
  • Geological setting of the Setúbal peninsula, the Santa Marta Formation and the Arrábida en.wikipedia.org

Free quote, with no obligation. Tell us the municipality, the length and the height — we reply with a figure.

Level or stepped?

Slightly undulatingPlot with gentle undulation. Much of the wall runs in a straight line, but where the ground falls away we make one or two steps of panel to follow the ground level.

What this changes in the wall

The steps are made in multiples of 500 mm, or 300 mm when a finer adjustment is needed.

An example to give a sense of scale: on a 5 % slope, a 50 metre wall drops 2.5 metres from one end to the other — five courses of 500 mm panel. That is why on a sloping plot the number of panels is not calculated from the length alone.

How we measure

Local slope median of 5.0 % in this municipality. Measured at 14 points spread across the territory, comparing the altitude of each point with four neighbours 120 metres away — roughly the length of a real wall. The median is used so that an isolated slope does not classify a flat municipality as sloping.

Elevations from the Copernicus digital terrain model, via an elevation API. open-meteo.com

As with the terrain, this is the municipality average and not your plot. A flat plot in a sloping municipality is perfectly possible — and the other way round too.

Licensing in Setúbal

The requirements are municipal: they depend on the height of the wall, its position relative to the public road, the property boundary and what the PDM for Setúbal lays down. We are not going to tell you it "is not needed" just to close a sale. Check with the municipal council before going ahead; if needed, we provide the dimensions and the drawing of the wall to support the application.

See all the municipalities where we work →

Request a free quote

Just leave your name and phone number — that is enough for us to get back to you. If you tell us the municipality, the length and the height, we will reply straight away with a price and with the lead time for the material.

Fields marked with * are required.

Required fields
Optional fields — help to give a more accurate price