Muros Pré-Fabricados 910 804 950

Where we work · Lisbon Metropolitan Area

Concrete walls in Seixal

Yes, we deliver and install in Seixal. Our warehouse is in the Greater Lisbon area, a 46.9 km from the municipality seat — about 41 minutes of road. The most common plot here is fine sand, which makes the installation simple. It is the plot, more than the length of the wall, that governs the lead time.

46.9 kmFrom our warehouse
41 minTravel time
Fine sandMost common ground
SimpleInstallation difficulty
South bankDelivery logistics
PlanGround relief
20–30 m/dayInstallation pace

Leave your name and phone number to receive the price

In 2 working days we send the price of your wall: how much the material costs and how much the supply and installation costs.

Delivery from our warehouse

We have our own warehouse in Greater Lisbon. From the warehouse door to Seixal town hall it is 46.9 km, about 41 minutes of road. The four stock textures leave without waiting for production; what is made to order goes into manufacturing first.

The delivery crosses the Tejo over the Vasco da Gama bridge, which adds a toll and sensitivity to peak-hour traffic — which is why unloading on the south bank is scheduled outside the busiest times.

Distance and time measured by actual road routing to the municipality's main town, not as the crow flies. Within the municipality the figure varies with the parish.

Salty air

This municipality has an exposed waterfront. It is where the difference between concrete and metal stops being aesthetic: concrete does not corrode or react to salt air, unlike any galvanised metal fence. The panel's water absorption is ≤ 6 %.

This applies to the wall, not to the accessories: gates, hinges and locks are still metal and still need maintenance near the sea.

What ground you will find in Seixal

In a precast concrete wall, almost all of the site time goes into drilling the post holes. That is why it is the plot, and not the length, that governs the lead time.

Simple Fine sand. Fine, clean sand, practically without stones.

What that means in practice

The quickest ground for drilling holes. Without gravel, the excavation is clean and rarely needs a breaker. The care needed is the opposite of limestone: a sand wall collapses, so the hole is concreted straight away and is not left open overnight.

High pace — this is where the 20 to 30 metres a day are met most often. Excellent drainage next to the post.

In this particular municipality

Tejo-Sado sand with an estuary frontage. An area of strong residential growth, with a great deal of new-plot fencing — the scenario in which the modular system pays off most, because there is no existing construction to work around.

A geological term, for anyone who wants to check: Areias do Tejo-Sado. Fine sands of the Pliocene and the Quaternary — the Formação de Santa Marta is described as fine sand, well graded and practically without gravel beds.

This is the municipality standard, not a guarantee for your plot. Two plots on the same street can have different layers, and old backfill turns up where nobody expects it. The lead time is only firm once we have seen the line of the wall — until then, what is here is meant to give you an idea, not to plan the works.
Each post is concreted into a hole of 300 × 300 × 800 mm, with 800 mm buried — the minimum is 700 mm. It is that embedment that ensures the wind resistance of the segment, and it is what the local geology makes easy or difficult.
  • Geological setting of the Lisbon region, the Volcanic Complex and the Miocene series pt.wikipedia.orglxrisk.cm-lisboa.pt
  • Geological setting of the Setúbal peninsula, the Santa Marta Formation and the Arrábida en.wikipedia.org

Free quote, with no obligation. Tell us the municipality, the length and the height — we reply with a figure.

Level or stepped?

PlanMostly flat plot. The wall runs in a continuous line, with every panel at the same level, and the alignment stays straight from end to end.

What this changes in the wall

It is the simplest and quickest scenario: less setting out, fewer adjustments and no panel cut.

An example to give a sense of scale: on a 5 % slope, a 50 metre wall drops 2.5 metres from one end to the other — five courses of 500 mm panel. That is why on a sloping plot the number of panels is not calculated from the length alone.

How we measure

Local slope median of 2.5 % in this municipality. Measured at 14 points spread across the territory, comparing the altitude of each point with four neighbours 120 metres away — roughly the length of a real wall. The median is used so that an isolated slope does not classify a flat municipality as sloping.

Elevations from the Copernicus digital terrain model, via an elevation API. open-meteo.com

As with the terrain, this is the municipality average and not your plot. A flat plot in a sloping municipality is perfectly possible — and the other way round too.

Licensing in Seixal

The requirements are municipal: they depend on the height of the wall, its position relative to the public road, the property boundary and what the Seixal PDM lays down. We are not going to tell you it "is not needed" just to close a sale. Check with the municipal council before going ahead; if needed, we provide the dimensions and the drawing of the wall to support the application.

See all the municipalities where we work →

Request a free quote

Within 2 working days we will send the price of your wall: how much the material costs and how much the supply and installation costs. The final value is confirmed by the manager.

Just leave your name and phone number — that is enough for us to get back to you. If you tell us the municipality, the length and the height, we will reply straight away with a price and with the lead time for the material.

Fields marked with * are required.

Required fields
Optional fields — help to give a more accurate price