Muros Pré-Fabricados 910 541 877

Where we work · Lisbon Metropolitan Area

Concrete walls in Alcochete

Yes, we deliver and install in Alcochete. Our warehouse is in the Greater Lisbon area, a 41.7 km from the municipality seat — about 35 minutes of road. The most common plot here is fine sand, which makes the installation simple. It is the plot, more than the length of the wall, that governs the lead time.

41.7 kmFrom our warehouse
35 minTravel time
Fine sandMost common ground
SimpleInstallation difficulty
South bankDelivery logistics
PlanGround relief
20–30 m/dayInstallation pace

Delivery from our warehouse

We have our own warehouse in Greater Lisbon. From the warehouse door to Alcochete town hall it is 41.7 km, about 35 minutes of road. The four stock textures leave without waiting for production; what is made to order goes into manufacturing first.

The delivery crosses the Tejo over the Vasco da Gama bridge, which adds a toll and sensitivity to peak-hour traffic — which is why unloading on the south bank is scheduled outside the busiest times.

Distance and time measured by actual road routing to the municipality's main town, not as the crow flies. Within the municipality the figure varies with the parish.

Exposure

With no exposed water frontage, durability comes down mainly to the winter freeze-thaw cycles and to rain. Vibro-compacted concrete has water absorption of ≤ 6 %, which reduces the microcracking associated with temperature variation.

Reaction to fire A1: it does not burn or spread smoke, which matters in areas with scrub close to the property boundary.

Free quote, with no obligation. Tell us the municipality, the length and the height — we reply with a figure.

Request a free quote or we call you:

What ground you will find in Alcochete

In a precast concrete wall, almost all of the site time goes into drilling the post holes. That is why it is the plot, and not the length, that governs the lead time.

Simple Fine sand. Fine, clean sand, practically without stones.

What that means in practice

The quickest ground for drilling holes. Without gravel, the excavation is clean and rarely needs a breaker. The care needed is the opposite of limestone: a sand wall collapses, so the hole is concreted straight away and is not left open overnight.

High pace — this is where the 20 to 30 metres a day are met most often. Excellent drainage next to the post.

In this particular municipality

Large, flat plots, with as much agricultural plot fencing as residential. The sand allows many holes to be opened in the same day, which makes long perimeters more competitive here than on the north bank.

A geological term, for anyone who wants to check: Areias do Tejo-Sado. Fine sands of the Pliocene and the Quaternary — the Formação de Santa Marta is described as fine sand, well graded and practically without gravel beds.

This is the municipality standard, not a guarantee for your plot. Two plots on the same street can have different layers, and old backfill turns up where nobody expects it. The lead time is only firm once we have seen the line of the wall — until then, what is here is meant to give you an idea, not to plan the works.
Each post is concreted into a hole of 300 × 300 × 800 mm, with 800 mm buried — the minimum is 700 mm. It is that embedment that ensures the wind resistance of the segment, and it is what the local geology makes easy or difficult.
  • Geological setting of the Lisbon region, the Volcanic Complex and the Miocene series pt.wikipedia.orglxrisk.cm-lisboa.pt
  • Geological setting of the Setúbal peninsula, the Santa Marta Formation and the Arrábida en.wikipedia.org

Level or stepped?

PlanMostly flat plot. The wall runs in a continuous line, with every panel at the same level, and the alignment stays straight from end to end.

What this changes in the wall

It is the simplest and quickest scenario: less setting out, fewer adjustments and no panel cut.

An example to give a sense of scale: on a 5 % slope, a 50 metre wall drops 2.5 metres from one end to the other — five courses of 500 mm panel. That is why on a sloping plot the number of panels is not calculated from the length alone.

How we measure

Local slope median of 1.7 % in this municipality. Measured at 14 points spread across the territory, comparing the altitude of each point with four neighbours 120 metres away — roughly the length of a real wall. The median is used so that an isolated slope does not classify a flat municipality as sloping.

Elevations from the Copernicus digital terrain model, via an elevation API. open-meteo.com

As with the terrain, this is the municipality average and not your plot. A flat plot in a sloping municipality is perfectly possible — and the other way round too.

Licensing in Alcochete

The requirements are municipal: they depend on the height of the wall, its position relative to the public road, the property boundary and what the PDM for Alcochete lays down. We are not going to tell you it "is not needed" just to close a sale. Check with the municipal council before going ahead; if needed, we provide the dimensions and the drawing of the wall to support the application.

See all the municipalities where we work →